
Project Description
CLIENT : Al Massaleh Real Estate Co.
Construction, Execution & Maintenance
* The Project is A High – Rise office Tower Consisting.
* Basement
* Ground Floor
* Mezzanine
* 2 Services Floor
* 16 Typical Floors ( Offices)
Construction, Execution & Maintenance
* The Project is A High – Rise office Tower Consisting.
* Basement
* Ground Floor
* Mezzanine
* 2 Services Floor
* 16 Typical Floors ( Offices)
Construction of the new head office of the Kuwait National Petroleum Company (KNPC), which includes an office space spread over 42,000m2 and also Parking area for 600 Vehicle Additional Scope
•Construction of Strom Water and Sanitary Drainages System
• Road Paving •Electrical & Mechanical Installations
•Elevator and Escalators Supply and Installations
•Interiors Finishing &
•Landscaping KNPC’s building won an International Award for this Design .
Messilah Beach 5 star Hotel and other related building approx.
89,000m2 total built up space wholly on site A and extensive hard soft landscaping works on sites A & B and refurbishment of existing parking and roads construction of around about etc. and utility connection works on sites C.
RA/237
Construction, Completion and maintenance of roads, bridges, storm water and sanitary streams and other services for the road connecting between Al-Zoor Port and Wafra. The project is located south Kuwait on a length of 33KM and consists of five crossings and bridges with three lanes in each direction.
Client : Ministry of Public WorkCompany
DEPARTMENT : Civil
ROLE : Main Contractor
6 Multilevel Car park with 2 bridges connecting existing hospitals in various area in Kuwait.
The car parks were executed on a fast track design/ Built method using Precast- Concrete.