- Transporting industrial pipeline materials – KCPC
- Road infrastructure curbing and earthworks project – KCPC
- Blue industrial gate valves for water pipeline infrastructure – KCPC
- Underground manhole installation – KCPC
- Highway trench excavation and construction – KCPC
- Road infrastructure concrete barrier – KCPC
- Worker cutting a concrete core sample with a masonry circular – KCPC
- Stack of large yellow industrial pipes at a construction – KCPC
- Water tanker truck spraying an excavated trench with a laid pipeline – KCPC
- Underground infrastructure pipeline installation with structural bracing – KCPC
- Road infrastructure crew working on a new highway project – KCPC
Project Description
CLIENT : MPW
DEPARTMENT : Infrastructure
ROLE :Main Contractor
Construction, Execution & Maintenance.
* Storm Water—- 27819 Mtr. Run
* Dia———-(250 mm to 2000 mm)
* Sanitary Sewer- 30,680 Mtr. Run
* Dia ———(200 mm to 400 mm)
* Fresh and Brakish— 88,000 Mtr Run Water networks
* Dia ——-(80 mm – 400 mm)
* Street Lighting——- 972 Nos
* M.O.C—– 33920 Mtr.Run